Operation of UHV Laboratory
Operation of UHV Laboratory: Operation of UHV Laboratory are designed as indoor laboratories or outdoor laboratories depending on the specific requirements. An indoor laboratory is preferred when most of the…
Operation of UHV Laboratory: Operation of UHV Laboratory are designed as indoor laboratories or outdoor laboratories depending on the specific requirements. An indoor laboratory is preferred when most of the…
Partial Discharge Measurements: Earlier the testing of insulators and other equipment was based on the insulation resistance measurements, dissipation factor measurements and breakdown tests. It was observed that the dissipation…
Schering Bridge Theory for Three Terminal Measurement: For two terminal measurements the bridge is grounded at its junction points. The supply transformer, detector, and all the components of the bridge…
Dissipation Factor in Schering Bridge: Extension of range of the Dissipation Factor in Schering Bridge can be achieved by connecting in parallel an additional large capacitance across C3. But to…
Dielectric Constant and Loss: Many insulating substances have dielectric constant greater than unity and have Dielectric Constant and Loss when subjected to a.c. voltages. These two quantities, namely, the dielectric…
Direct Current Resistivity Method: The specimen shape and the electrode arrangement should be such that the Direct Current Resistivity Method can be easily calculated. For a solid specimen, the preferable…
Insulation Coordination of Substation: For steep fronted lightning waves at Insulation Coordination of Substation and at different points on lines, the voltages at sub-stations may exceed the protective level depending…