Site Selection for Hydroelectric Power Plant

Site Selection for Hydroelectric Power Plant: The Site Selection for Hydroelectric Power Plant includes several structures like dam, conduits intakes, surge tank, power house and many others. It requires several…

Continue Reading Site Selection for Hydroelectric Power Plant

Fuel Handling System and Ash Handling System

Fuel Handling System and Ash Handling System: Handling of coal: The coal handling is divided into two types: Out-plant handling. In-plant handling. 1. Out-plant handling: This handling includes the handling…

Continue Reading Fuel Handling System and Ash Handling System

Darlington Connected Output Transistors

Darlington Connected Output Transistors: High-power transistors usually have low current gains, so relatively large base currents must flow into Q2 and Q3 to supply a high load current. This means…

Continue Reading Darlington Connected Output Transistors

Capacitor Coupled Class AB Output Stage

Capacitor Coupled Class AB Output Stage: The basic circuit of a Class-AB amplifier using a complementary emitter follower output stage and a Capacitor Coupled Class AB Output Stage load is…

Continue Reading Capacitor Coupled Class AB Output Stage

Distribution System Connection

Distribution System Connection: All Distribution System Connection of electrical energy is done by constant voltage system. In practice, the following distribution circuits are generally used 1.Radial System: In this system,…

Continue Reading Distribution System Connection